Verification of project
Instructions for verifying project
Every exhibitor who independently builds a stand and every contractor hired by the exhibitor to build a stand must submit the stand project to the Project Bureau of the Fair for approval, no later than three days before the start of the stand assembly period. The period of assembly and disassembly is determined in advance by the organizer of the event, about which the exhibitor is informed during registration.
Projects are submitted exclusively to the email address: overaprojekta@sajam.rs in PDF format A4, vertical orientation, and must contain:
- drawing of the base of the stand
- a drawing of the layout of the stand
- technical description of the stand with listed all materials used in the construction of the walls of the stand, floor of the stand
- the drawing must be dimensioned or
- 3D drawing of the stand from 2 angles with technical description of the stand
Each Project sent for approval must also contain the following information:
- the name of the exhibitor and performer
- the name of the fair event
- hall number
- booth number
- contact person
- telephone/fax number
- E-mail address
Every performer is obliged to fill out the Application, which regulates the rights and obligations of performers at the events of the Belgrade Fair.
We ask all exhibitors and contractors to familiarize themselves with the Regulations on participation in Belgrade Fair events and the schematic representation of ZONEs – height restrictions for the construction of stands by halls, before designing the stand.
The Contractor – the company that builds the stand – is responsible for paying the fee for common costs and certifying the project.
If the exhibitor builds the stand himself, his obligation is to verify the project and pay the compensation for common costs.
The price of the fee for common costs with the approval of the project is € 4,50 sq.m.
Exhibitors who build stands through the Project Bureau of the Belgrade Fair do not pay compensation for common costs.
Billable square footage calculation table:
- 0-150m2 - every m2 is calculated
- 151-300m2 - fixed 150m2 + 40% of the difference between 300 and 150m2
- 301-500m2 - fixed 210m2 + 30% difference between 500 and 300m2
- more than 500m2 - fixed 270m2 + 20% of the difference between the actual square footage and 500m2
All prices do not include VAT.